Project Information >
Ko Chang, located in Trat Province, is the third-largest island in Thailand and is internationally renowned as a major tourist destination. The island is characterized by its diverse natural landscapes and scenic beauty, attracting both domestic and international tourists from around the world. However, transportation between the mainland and Ko Chang currently relies primarily on ferry services for the movement of passengers and vehicles. This dependence presents significant transportation and accessibility challenges, adversely affecting the quality of life of local residents. Key issues include limited access to healthcare services, particularly the emergency transfer of patients during nighttime hours; difficulties in accessing educational institutions on the mainland in Trat Province; and logistical constraints associated with the transportation of goods, resulting in higher prices for consumer goods and essential commodities compared with other areas.
Recognizing these challenges and the need for appropriate solutions, the Ministry of Transport (MOT) instructed the Expressway Authority of Thailand (EXAT) to consider the development of a bridge connecting the mainland to Ko Chang. EXAT was also directed to coordinate with the Department of Rural Roads (DRR) in conducting the necessary surveys, studies, and engineering design for the proposed bridge. The primary objective is to enhance the transportation network by establishing a reliable, all-weather connection between the mainland and Ko Chang, providing 24-hour accessibility. The proposed project is expected to address existing transportation constraints, improve travel convenience, reduce travel times, and alleviate challenges affecting the quality of life of Ko Chang residents. Furthermore, the project is anticipated to support regional economic growth and contribute to the sustainable development of Thailand's tourism sector.
Project Timeline
2020 |
2021 |
2022 |
2023 |
Trat Province requested assistance from the Department of Rural Roads (DRR) to conduct a study and design a bridge to Ko Chang. |
September 27, 2021 |
The Minister of Transport assigned the Department of Rural Roads to conduct a feasibility study for the construction of the bridge crossing to Ko Chang. |
February 10, 2023 |
During the 2/2020 meeting of the Trat Provincial Committee for Driving Thailand Forward Together, Trat Province requested assistance from the Department of Rural Roads (DRR) to carry out the study and design for the bridge crossing to Ko Chang. |
Pursuant to the Trat Provincial Order regarding the appointment of the steering committee and working group to organize public hearings on the construction of the bridge crossing to Ko Chang, the majority of the public agreed with the bridge construction. |
During the meeting on infrastructure development for Trat Province, the Minister of Transport assigned the Department of Rural Roads to conduct a feasibility study for the construction of the bridge crossing to Ko Chang. This aims to resolve transportation difficulties for Ko Chang residents and tourists, as well as significantly improve the public's quality of life. |
The Ministry of Transport issued a directive at the end of a memorandum from the Office of the Permanent Secretary for Transport, instructing the Expressway Authority of Thailand (EXAT) to coordinate with the Department of Rural Roads (DRR) in surveying, studying, and designing the bridge crossing to Ko Chang. As the project involves continuous construction connecting the bridge (under EXAT) with the road network (under DRR), the DRR is tasked with supporting EXAT with relevant data and operations going forward. |
The Expressway Authority of Thailand (EXAT) has therefore hired a consultant to conduct a feasibility study covering engineering, economic, financial, and environmental impact aspects for the Ko Chang Expressway Link Project in Trat Province. This initiative aims to provide an alternative route that offers greater convenience and safety for travelers heading to Ko Chang, while enhancing transportation capacity, improving travel efficiency to the island, and further promoting tourism.
Project Scope
Part 1: Feasibility study covering engineering, economic, financial, and environmental impact aspects for the Ko Chang Expressway Link Project.
Part 2: Survey and definitive design.
Part 3: Project public relations and public participation.
Part 4: Feasibility study and analysis of Public-Private Partnership (PPP) models, including private sector interest assessment (Market Sounding).
Part 5: Preparation of the key framework for the Request for Proposal (RFP) documents and the draft PPP contract.
Project Status
On May 30, 2024, the Expressway Authority of Thailand (EXAT) signed a contract with a consultant to conduct the engineering, economic, financial, and environmental impact feasibility study for the Ko Chang Expressway Link Project in Trat Province. The study spans 720 days (24 months), after which the Environmental Impact Assessment (EIA) report and project construction will be submitted for approval. Construction is expected to commence in 2031, with operations scheduled to begin in 2035
